What Permits Are Needed Before Excavation Work in PA?
- Dombrowski Projects

- Aug 3
- 8 min read
Key Takeaway
Most excavation projects in Pennsylvania require at least one permit before any dirt is moved, and skipping this step can result in fines, stop-work orders, or costly project delays.
Pennsylvania's Act 73, also known as the PA One Call Law or PA 811, requires all excavators to notify the Pennsylvania One Call System before digging, making utility marking a legal requirement, not just a best practice.
Local township and county permits vary by project type and scope, so what applies in Greensburg may differ from requirements in North Huntingdon or Murrysville.
Working with a licensed, experienced excavation contractor protects you from permit mistakes and keeps your project on schedule and within budget.

You have a project in mind, the ground is ready, and the crew is standing by. Then someone asks: "Did you pull the permit?" If you do not know the answer, you are not alone, and the cost of guessing wrong can be steep. Stop-work orders, fines, and forced removal of completed work are all real consequences homeowners and property owners face when excavation starts without the right approvals in place.
Pennsylvania has specific permit requirements that vary by project type, scope, and municipality, and it is not always obvious which ones apply to your situation. Whether you are planning a driveway, a new foundation, a drainage fix, or a pool, the permit process needs to happen before the first bucket of dirt moves. The team at Excavation & Site Work projects around Irwin, PA understands what local townships require and handles the permit process as a standard part of every job.
Why This Matters for Irwin, PA Residents
Obtaining an excavation permit in Pennsylvania is not just a bureaucratic formality. It protects your property, your neighbors, and your investment. In Westmoreland County and the surrounding Pittsburgh metro communities, the stakes are higher than many homeowners expect.
The region sits at the edge of Pennsylvania's Allegheny Plateau, where clay-heavy glacial soils expand and contract with the seasons. That soil movement is a leading cause of retaining wall failure, drainage problems, and foundation shifting across North Huntingdon, Murrysville, and nearby communities. Because of this, permit requirements in the area often include specific grading and stormwater provisions that directly address how excavated sites must be stabilized and drained. Skipping the permit process here does not just create a legal problem. It means the project may not meet the drainage and grading specifications designed to account for exactly this type of soil behavior, and that shortcut creates expensive problems years down the road.
Understanding the permit requirements upfront is the first step toward a project that holds up. For a closer look at what happens on site before building begins, What Does an Excavation Company Do Before Building? walks through the full preparation process.
What Permits Are Typically Required for Excavation Work in PA
The specific permits required for an excavation permit in Pennsylvania depend on what you are digging, how deep, and where the property sits. Here is what most excavation projects will involve:
Pennsylvania One Call notification, known as PA 811, is legally required before any digging. Pennsylvania's Act 73, the PA One Call Law, establishes this as a mandatory step under state law that must be completed at least three business days before breaking ground. It is not a permit itself, but no excavation can legally proceed without it.
A zoning permit or land disturbance permit from your local township or municipality is often required for grading, site clearing, or any work that changes the contour of the land.
A building permit is required when excavation is tied to a structure, such as a new home, addition, or garage foundation.
An NPDES permit from the Pennsylvania Department of Environmental Protection is required for land disturbance projects that disturb one acre or more of soil.
A floodplain permit may apply if your property falls within a regulated floodplain area, which is common along waterways in Westmoreland County.
The PA One Call Law and Why It Is Non-Negotiable
Pennsylvania's Act 73 established the PA One Call Law, and the system is now commonly referred to as PA 811. Both names refer to the same legal requirement: before any excavation takes place in Pennsylvania, the property owner or contractor must notify the Pennsylvania One Call System. This applies whether you are a homeowner digging a flower bed or a contractor moving thousands of yards of earth.
The notification must go in at least three business days before work begins. Utility companies then mark underground lines, including gas, electric, water, and telecommunications, so the crew knows exactly where it is safe to dig.
What Happens If You Skip PA One Call
Skipping this step puts lives at risk and creates serious legal liability. Striking a gas or electric line causes dangerous conditions for everyone on site and can result in significant fines. Beyond safety, an unmarked utility strike can delay your entire project while repairs are made and inspections are completed.
Who Makes the PA One Call Notification
Either the homeowner or the contractor can make the notification, but a reputable excavation contractor will handle it as a standard part of project preparation. It should not be something you have to ask about. It should already be on the contractor's checklist before they set foot on your property. If you are evaluating contractors and want to know what to look for, How to Find an Excavation Contractor in Pittsburgh? covers the key questions to ask before hiring.
Township and Municipal Permits in Westmoreland County
State-level requirements are just the starting point. Local townships in Westmoreland County each have their own permit requirements, and they do not always match from one municipality to the next. North Huntingdon Township, Penn Township, and the City of Greensburg each maintain their own building and land disturbance permit processes.
For residential projects like Foundation Excavation or Swimming Pool Excavation, you will typically need to submit a permit application that includes a site plan showing the scope of the work, proposed grading, and how stormwater will be managed. Permit review timelines vary, but planning for at least two to four weeks is a reasonable expectation in most Westmoreland County municipalities.
Projects That Often Surprise Homeowners with Permit Requirements
Some projects seem minor but still trigger permit requirements. If you are planning Land Grading work across Westmoreland County, even a moderate slope correction may require a land disturbance permit if it changes drainage patterns. Site Clearing projects that disturb a significant portion of a lot can also fall under local land disturbance rules even when no structure is involved. For more on when clearing work triggers permit requirements, What Is Land Clearing and When Does Your Yard Need It? provides a useful breakdown.
Drainage-related excavation is another area where homeowners are often caught off guard. What Does a Grading Contractor Do for Your Property? explains how grading work intersects with drainage planning and why those projects frequently require permits even when the scope appears limited.
Cost and Timeline Considerations
Permit fees vary by municipality and project scope. Some township permits run a flat fee, while others are calculated based on the value of the work or the square footage of disturbance. The honest answer is that you will not know the exact cost until the application is reviewed.
Here is what you can control:
Start the permit process early. Waiting until the last minute adds delays that push your project timeline back.
Have your site plan ready before you apply. A detailed plan speeds up the review process.
Work with a contractor who knows the local requirements and has pulled permits in your township before.
Get your estimates upfront before any work begins so there are no surprises in the total project cost.
People Also Ask
Do I need a permit to excavate on my own property in Pennsylvania?
In most cases, yes. Pennsylvania law requires PA One Call notification before any excavation, and local municipalities typically require zoning or land disturbance permits for work that alters the grade or drainage of a property. The type and scope of your project determine exactly which permits apply.
How long does it take to get an excavation permit in PA?
Permit timelines depend on the municipality and project complexity. Most local township permits in Westmoreland County take anywhere from one to four weeks to process. Larger projects requiring state-level NPDES permits may take longer, so beginning the application process well before your target start date is strongly recommended.
What is the PA One Call law for excavation?
Pennsylvania's Act 73, the PA One Call Law, requires anyone planning to excavate to notify the Pennsylvania One Call System at least three business days before digging begins. The system is also commonly called PA 811. Utility companies then mark underground lines so excavators can avoid them. Failure to comply is a violation of state law and creates serious safety and liability risks.
What happens if you excavate without a permit in Pennsylvania?
Excavating without a required permit can result in stop-work orders, financial fines, and mandatory removal of completed work. Your municipality has the authority to require you to restore the site to its original condition at your own expense. In some cases, unpermitted work can also complicate future property sales or refinancing.
FAQ
Can my excavation contractor pull the permits for me?
Yes, and a reliable contractor should be able to handle permit applications on your behalf. At minimum, your contractor should walk you through every permit required before the project starts and confirm that PA One Call notification has been submitted well in advance of the dig date.
Do I need a permit for excavation if I am just fixing drainage on my property?
Possibly. Any work that significantly alters the grading or drainage patterns of your property may require a land disturbance permit from your township, even if it does not involve a structure. The best approach is to confirm with your local municipality and your contractor before any work begins. How Does Land Grading Fix Drainage Issues in Irwin PA? covers how that type of work is typically scoped and what the permit implications can be.
What does an excavation permit application typically include?
Most local permit applications require a site plan showing the property boundaries, the area of disturbance, the proposed grading, and how stormwater runoff will be controlled. Some municipalities also require soil erosion and sediment control plans for projects above a certain disturbed area threshold.
Is a permit required for excavation work done by a homeowner, not a contractor?
Yes. Permit requirements apply to the property and the project, not just to licensed contractors. If you are a homeowner doing the work yourself, you are still responsible for obtaining the required permits and making the PA One Call notification before digging begins.
Ready to Start Your Excavation Project the Right Way?
With more than 10 years in the trades and a track record of completed projects across Irwin, North Huntingdon, Greensburg, Murrysville, and the broader Westmoreland County area, the team at Dombrowski Projects handles every aspect of the excavation process with the diligence it deserves. That means permits are accounted for, PA One Call is submitted before the first bucket moves, and you receive a transparent upfront estimate with no hidden fees before any work begins. We built this company from a single skid steer and a commitment to doing things right, and that has not changed.
Permit questions should never slow down a project that is planned correctly from the start. Our crew knows what local townships require and how to move efficiently through the process so your project stays on schedule.
Visit Dombrowski Projects or call 412-742-6226 today. We handle the permit process alongside every excavation job so your project starts right and finishes on time. Contact us for more information.