What Counts as Clean Fill in Pennsylvania?

Under 25 Pa. Code 271.1, clean fill dirt in Pennsylvania is uncontaminated, inert material such as soil, rock, stone, gravel, brick, block, concrete or used asphalt that is kept separate from other waste and used to level ground or bring it to grade. The same section treats wood, plaster, metals and unsegregated concrete from building or demolition work as construction/demolition waste, which is not clean fill.
Pennsylvania's waste rules, at 25 Pa. Code 271.1, define clean fill as "Uncontaminated, nonwater-soluble, nondecomposable inert solid material used to level an area or bring the area to grade." PA DEP's Management of Fill Policy requires environmental due diligence to decide whether fill is clean or regulated. DEP uses its electronic Form FP-001 to document clean fill determinations, for example, when fill comes from a site with a known release, and DEP's policy FAQ says the person making the determination completes Sections 1 and 2 while the receiver completes Section 3 with a PIN from DEP. This post covers what qualifies, what rules a load out, how FP-001 works, DEP's 2026 rebar draft and the other rules where fill is placed.

What Materials Count as Clean Fill Dirt in Pennsylvania?
Fill dirt is the everyday name for soil and rock hauled in to raise a low spot or bring ground to grade, and clean fill is the legal category a load has to meet. 25 Pa. Code 271.1 lists the materials that fall outside the construction/demolition waste definition "if they are separate from other waste and are used as clean fill":
Uncontaminated soil, rock, stone, gravel, brick and block, concrete and used asphalt
Waste from land clearing, grubbing and excavation, including trees, brush, stumps and vegetative material
DEP's policy FAQ (revised December 10, 2019) adds a wrinkle for broken masonry: "Some materials that can qualify as fill, such as brick, block and concrete from construction and demolition activities, are municipal waste because of the manner in which they were generated." Using them as clean fill still needs no permit when the use complies with the exceptions in 25 Pa. Code 271.101(b)(3) or 287.101(b)(6).
If an excavation leaves broken concrete or block behind, this post on debris removal after excavation, from sorting to hauling and final clearing explains how that cleanup is sequenced.
What Keeps a Load of Fill Dirt From Being Clean Fill?
Mixing is the first problem. Soil with scrap lumber, plaster or metal in it can fall under 271.1's construction/demolition waste definition, which names "wood, plaster, metals, asphaltic substances, bricks, block and unsegregated concrete."
Contamination is the second. Clean fill has to be uncontaminated, and DEP's due diligence step exists to catch fill from a site with a spill or release of a regulated substance.
Condition counts too. DEP's FAQ says fill with free liquids "cannot be used as clean fill," and fill with a strong odor may not be used if it will cause a public nuisance. The FAQ also says mine spoils may not be managed under the fill policy.
Painted brick and block get a lead check, which matters when an older garage or wall in Irwin or North Huntingdon comes down. The FAQ puts it this way: "If the due diligence shows that the brick or block was painted after 1978 (the date lead was prohibited in paint), then there is no concern for lead in the paint. If painting occurred prior to 1978, then the paint should be tested." If testing shows the paint is lead free, the FAQ says the brick or block may be used as clean fill.
Material that does not qualify as clean fill has to be handled another way, such as hauling and disposal. This post on what happens to excavation debris, from hauling to disposal covers that side of a job.
How Does DEP's Fill Due Diligence Work?
Environmental due diligence is a background check on where the fill came from. The 2004 edition of DEP's fill policy described it as investigative techniques such as visual property inspections, electronic database searches, review of a property's ownership and use history, Sanborn maps, environmental questionnaires, and analytical testing, environmental assessments or audits.
That edition set out a simple order. If due diligence shows no evidence of a release of a regulated substance, the material may be managed as clean fill; if it shows evidence of a release, the material must be tested to see whether it qualifies. DEP's June 2018 slides on the revision describe the same steps.
When testing is needed, DEP's December 5, 2019 webinar says clean fill concentration limits are "Based on soils at residential properties," drawn from 25 Pa. Code Chapter 250 tables.
If someone offers free fill dirt, ask where it came from, what that property was used for, and whether the material was tested.
Who Fills Out Form FP-001, and When?
FP-001 records a clean fill determination, such as one made for fill from a site with a known release, and DEP now takes it electronically. DEP's policy FAQ lays out the steps:
The person making the fill determination completes Sections 1 and 2.
DEP sends the receiving party a PIN to complete Section 3.
After the notice of receipt, the material covered by the determination may move from the generating site to the receiving site.
According to DEP's December 2019 webinar, DEP does not issue approvals for these forms. The FAQ says DEP regional offices receiving FP-001 submittals may review them for compliance with the policy.
If you are unsure whether a specific load needs the form, check with PA DEP's Southwest Regional Office, which serves Westmoreland County, before the fill arrives.
Does DEP's Fill Policy Cover Soil Moved Within Your Own Project?
No. DEP's FAQ says the Management of Fill Policy "does not apply to the movement of fill within a project area or right-of-way." Cutting soil from a high corner of a lot and spreading it in a low spot on the same project sits outside the policy, though erosion and local grading rules still apply.
For how leveling fits into a larger job, this overview of site grading on hillside terrain walks through the grading process. A new house moves a lot of soil too, and this post on foundation excavation steps, from footings to drainage before backfill covers that dig.
Is Concrete With Rebar Clean Fill Under DEP's 2026 Draft?
PA DEP shared a draft policy, document 254-2000-715, with its Solid Waste Advisory Committee on March 19, 2026. It covers land clearing, grubbing and excavation (LCGE) waste and concrete or other clean fill containing protruding rebar or other metal. Its effective date reads "Upon publication as final in the Pennsylvania Bulletin," and as of October 2026 it was still a draft.
On rebar, the draft says: "Uncontaminated concrete containing protruding rebar will be considered clean fill provided the protruding rebar is removed or covered in a manner that does not create or have the potential to create safety hazards."
On stumps and brush, the draft points to 25 Pa. Code 271.101(b)(4), under which no permit is needed to use LCGE waste as clean fill "if it is not hazardous and best management practices are implemented," with those practices set out in DEP's manual 254-5400-001. Township codes can go further; Moon Township in Allegheny County, for example, bars organic or frozen materials from fills under its grading code, so check with your township or borough before burying stumps.
What Other Rules Apply Where Fill Is Placed?
The 2004 edition of DEP's fill policy points to Chapter 102 (Erosion and Sediment Control) and Chapter 105 (Dam Safety and Waterway Management) wherever clean fill is placed.
Under 25 Pa. Code 102.4, erosion and sediment best management practices are required for all earth disturbance, and a written E&S Plan is required once total disturbance reaches 5,000 square feet. Fill located "in, along or across or projecting into a watercourse, floodway or body of water" is a water obstruction under 25 Pa. Code 105.1, and 105.11 says a person may not build one without first obtaining a written permit from DEP.
Local grading and stormwater rules add another layer, so check with North Huntingdon Township, Irwin Borough, or your township or borough, and the Westmoreland Conservation District, before a large load arrives.
FAQ
Is fill dirt the same as clean fill?
Not automatically. "Fill dirt" describes what the material is used for, while clean fill is the legal category in 25 Pa. Code 271.1, which requires material that is uncontaminated, inert and separate from other waste.
Is free fill dirt safe to accept?
It can be, but the price says nothing about the source. Under DEP's policy, evidence of a release at the source means the fill must be tested before it can qualify as clean fill. Look for wood, metal, plaster, free liquids or a strong odor, and ask whether the material was tested.
Can used asphalt be clean fill?
Used asphalt can qualify if it is uncontaminated and kept separate from other waste. 25 Pa. Code 271.1 lists used asphalt with soil, rock, stone, gravel, brick, block and concrete.
Do you need a permit to bring clean fill onto a property?
Not under Pennsylvania's waste rules, if the material qualifies; 25 Pa. Code 271.101 lists the use of separated clean fill materials among activities that need no waste permit. Under 25 Pa. Code 102.5, earth disturbance of 1 acre or more needs an NPDES permit, and local grading rules can still apply, so check with your township or borough first.
Does clean fill cost landfill fees?
No. DEP's Management of Fill Policy FAQ says, "Clean fill is not subject to landfill fees."
What is regulated fill?
Regulated fill is fill affected by a spill or release of a regulated substance, with concentrations above DEP's clean fill limits, which are based on residential soils. DEP's FAQ says it can be used under the general permit for regulated fill, WMGR096, if it meets the regulated fill limits, which are based on non-residential values.
Soil Removal and Disposal From Dombrowski Projects
Dombrowski Projects is a family-owned excavation and construction contractor based in Irwin. Its excavation services include grading, land excavation and soil removal and disposal, and its debris removal service covers construction and demolition debris, brush and down trees. Request a free estimate for soil or debris work in Irwin, North Huntingdon or nearby Westmoreland County.
Visit Dombrowski Projects or call 412-742-6226 today. Contact us for more information.




Comments